Strategic Systems


... innovative techniques
that work ...

                           
HomeProductsEP Product Sheet → Procedures ← Product Sheet
← Work Instructions
← Templates
← Testimonials
← "Road Map"
The EP methodology

Procedures - the "what" to do

  Product Line
Procedure Sys S/W H/W
1. Acceptance Testing (EP-215) Y Y Y
2. Baseline (EP-216) Y Y Y
3. Code and Unit Testing (EP-211) Y Y N
4. Configuration Management (EP-260) Y Y Y
5. Critical Design Review (EP-210) Y Y Y
6. General Administration (EP-290) Y Y Y
7. Hardware Detailed Design (EP-209) Y N Y
8. Hardware Preliminary Design (EP-206) Y N Y
9. Hardware Production (EP-218) Y N Y
10. Hardware Prototyping (EP-212) Y N Y
11. Installation (EP-217) Y Y Y
12. Integration and Test (EP-213) Y Y Y
13. Maintenance and Support (EP-219) Y Y Y
14. Preliminary Design Review (EP-207) Y Y Y
15. Project Management (EP-250) Y Y Y
16. Project Start Up (EP-201) Y Y Y
17. Quality Assurance (EP-280) Y Y Y
18. Requirements Analysis (EP-203) Y Y Y
19. Requirements Review (EP-204) Y Y Y
20. Software Detailed Design (EP-208) Y Y N
21. Software Preliminary Design (EP-205) Y Y N
22. System Administration (EP-270) Y Y Y
23. System Prototyping (EP-202) Y Y Y
24. Test Readiness Review (EP-214) Y Y Y

↑ Top ↑

email: info@ss.com.au   |   phone: +61 8 9457 3664   |   fax: +61 8 9457 3665

© Copyright Strategic Systems (WA) Pty Ltd