| |
Product Line |
| Procedure |
Sys |
S/W |
H/W |
| 1. Acceptance Testing (EP-215) |
 |
 |
 |
| 2. Baseline (EP-216) |
 |
 |
 |
| 3. Code and Unit Testing (EP-211) |
 |
 |
 |
| 4. Configuration Management (EP-260) |
 |
 |
 |
| 5. Critical Design Review (EP-210) |
 |
 |
 |
| 6. General Administration (EP-290) |
 |
 |
 |
| 7. Hardware Detailed Design (EP-209) |
 |
 |
 |
| 8. Hardware Preliminary Design (EP-206) |
 |
 |
 |
| 9. Hardware Production (EP-218) |
 |
 |
 |
| 10. Hardware Prototyping (EP-212) |
 |
 |
 |
| 11. Installation (EP-217) |
 |
 |
 |
| 12. Integration and Test (EP-213) |
 |
 |
 |
| 13. Maintenance and Support (EP-219) |
 |
 |
 |
| 14. Preliminary Design Review (EP-207) |
 |
 |
 |
| 15. Project Management (EP-250) |
 |
 |
 |
| 16. Project Start Up (EP-201) |
 |
 |
 |
| 17. Quality Assurance (EP-280) |
 |
 |
 |
| 18. Requirements Analysis (EP-203) |
 |
 |
 |
| 19. Requirements Review (EP-204) |
 |
 |
 |
| 20. Software Detailed Design (EP-208) |
 |
 |
 |
| 21. Software Preliminary Design (EP-205) |
 |
 |
 |
| 22. System Administration (EP-270) |
 |
 |
 |
| 23. System Prototyping (EP-202) |
 |
 |
 |
| 24. Test Readiness Review (EP-214) |
 |
 |
 |